VILLA BAHIA
VILLA BAHIA
WATCH YOUR DREAM HOME BEING CREATED
A) During drilling the flights of the auger are filled with soil, providing lateral support and maintaining the stability of the hole. B) At the same time the auger is withdrawn from the hole, concrete or a sand/cement grout is placed by pumping the concrete/grout mix through the hollow center of the auger pipe to the base of the auger that provides continuous support of the hole. C) Then Steel-reinforcement is placed into the hole.
Over-flow and spilags
FIDELITY REAL ESTATE LLC
JIM MORLOCK BROKER & OWNER
954.205.6673
Copyright © 2023 islaBahia23 - All Rights Reserved.
Waterfront Jim Productions